Abstract:
As of April 2008, the ERC approved 119 TSCs with electric cooperatives and private distribution utilities, 56 in Luzon, 31 in the Visayas and 32 in Mindanao. There are TSCs that have expired following ERC approval and been renewed while there are 25 DU-CSEEs are being readied for filing with the ERC. Eighteen (18) DU customers have been allocated to privatized or bidded out power plants.
Mindanao posted an increased of 6.0 percent in electricity sales with the “others” sector exhibiting 40.0 percent increased followed by commercial sector at 7.0 pe rcent, residential sector at 5.0 percent and industrial sector at 3.0 percent.
Info
| Source Institution | Department of Energy |
| Source URL | http://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/12th_EPIRA_Status_Report.pdf |
| Page Count | 84 |
| Place of Publication | Manila |
| Original Publication Date | |
| Tags | 12th Electric Power, Implementation Status Report, National Power Corporation, Power Industry, Reform Act |