The Luzon and Visayas transmission grids are interconnected by submarine cables with a capacity of 400 MW. Similarly, the islands in the Visayas grid are also interconnected with various capacities. The feasibility study for the interconnection of the Visayas and Mindanao grid has already been concluded in March 2013 and project completion is targeted on 2018.