Abstract:
The IMEM Operator shall consider additional constraints in its scheduling and settlement processes to reflect the technical characteristics of the facilities in the Mindanao Grid. The technical characteristics shall include, but not limited to, the minimum stable loading and ramping capabilities of the IMEM Generators.
Info
| Source Institution | Department of Energy |
| Source URL | http://www.doe.gov.ph/doe_files/pdf/Issuances/DC/DC2014-05-0010.pdf |
| Page Count | 23 |
| Place of Publication | Manila |
| Original Publication Date | |
| Tags | IMEM Rules, Mindanao Grid, Transitory Arrangements |
