Abstract:
Despite the available power generating capacities, the Mindanao Grid is currently experiencing rotating brownouts as a portion of these available capacities are allocated to meet the reserve requirements of the Mindanao transmission system pursuant to the standards set under the Philippine Grid Code (PGC).
Info
| Source Institution | Department of Energy |
| Source URL | http://www.doe.gov.ph/doe_files/pdf/Issuances/DC/DC2010-10-0011.pdf |
| Page Count | 3 |
| Place of Publication | Manila |
| Original Publication Date | |
| Tags | Industry Stakeholders, Mindanao Grid, Power Sector, Power Supply Situation, Rational Utilization |
