25th Electric Power Industry Reform Act Implementation Status Report

Abstract:

Mindanao grid still managed to increase its demand by 2.0 % compared to the highest demand at 1,457 MW in December 2013 despite imminent rotating brownouts in the area due to tight power supply condition. The recorded highest demand including embedded loads as of November 2014 was at 1,457 MW which occurred on 13 November 2014. Like Visayas, Mindanao is still expected to reach its highest peak at 1,473 MW this December 2014 (where the peak demand usually occurs) bas ed on the 7% GDP growth demand.

Info
Source InstitutionDepartment of Energy
Source URLhttp://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/25th_epira_report_final.pdf
Page Count183
Place of PublicationManila
Original Publication Date
Tags 25th Electric Power, Implementation Status Report, National Power Corporation, Power Industry, Reform Act