Abstract:
Total installed and dependable capacity in the country increased to 16,359 MW and 13,902 MW, respectively, with the entry of new capacities in Visayas and Mindanao grids. Four new power plants were connected to the grid adding 632 MW in capacity.
Total installed capacity in the country increased by 749MW or 4.8 percent from 15,610 MW in 2009 to 16,359 MW in 2010 with the entry of new capacities in Visayas and Mindanao grids. In 2010, four (4) new power plants were connected to the grids adding 632 MW in capacity. These are the coal-fired power plants in the Visayas, such as 3 x 82 MW by Cebu Energy Development Corporation, 2 x 72 MW by Panay Energy Development Corporation, and 2 x 100 MW by KEPCO-Salcon Corporation; and the 42 MW Sibulan Hydro power plant in Mindanao grid.
Info
| Source Institution | Department of Energy |
| Source URL | http://www.doe.gov.ph/doe_files/pdf/01_Energy_Situationer/2010%20Power%20Situationer.pdf |
| Page Count | 17 |
| Place of Publication | Manila |
| Original Publication Date | |
| Tags | Development Division, Power Industry, Power Planning, Power Sector, Sector Situationer |