Abstract:
The power generation component of the project will also help in meeting t he demand in the Mindanao power grid where a total of 1,600 megawatts ( MW ) additional capacity is seen to be needed in the planning period 2012 - 2030 to meet the electricity demand and the required reserve margin of the grid. T he grid, which , at present , barely meets the demand , does not have the capacity to produce the required reserve margin. The power generation component of the project , the feasibility of which is to be confirmed in the F/S updating, is envisaged to work towards diminishing this supply gap.
Info
| Source Institution | National Economic and Development Authority |
| Source URL | http://www.neda.gov.ph/wp-content/uploads/2014/08/Terms-of-Reference-for-the-Conduct-of-Feasibility-Study-for-the-Kabulnan-2-Multi-Purpose-Irrigation-and-Power-Project.pdf |
| Page Count | 30 |
| Place of Publication | Manila |
| Original Publication Date | |
| Tags | Feasibility Study, Irrigation and Power Project, Terms of Reference |